中文|ENGLISH

在线客服 >

周一至周五 :8:00-17:00

传真:022-28341925

联系电话:022-28160808

E-mail:fdine@fdine.com.cn

下载中心 >

液体散装码头您当前所在位置:首页 > 咨询设计 > 工程设计 > 港口码头及配套设施 > 液体散装码头 > 正文

Phase 1 and Phase 2 Crude Oil Terminals at Qinhuangdao Port

更新时间:2018-04-23 16:03:19点击次数:1116次
Phase 1 terminal has two berths for handling of crude oil on ships up to 20 000 DWT at rate of 10 mtpa. The wharf of caisson dolphin strucuter, in length of 278.5 m, is connected to shore by a trestle in length of 435.2 m. Phase 2 terminal has included th
相关介绍

Phase 1 terminal has two berths for handling of crude oil on ships up to 20 000 DWT at rate of 10 mtpa. The wharf of caisson dolphin strucuter, in length of 278.5 m, is connected to shore by a trestle in length of 435.2 m. Phase 2 terminal has included the construction of one berth in length of 322.5m for ships up to 50 000 DWT, a breakwater in length of 1 074m, a tank farm of 50 000 m3 storage capacity.


Copyright © 2009 fdine.com.cn All Rights Reserved 中交第一航务工程勘察设计院有限公司 版权所有

公司地址:天津市河西区颐航大厦(洞庭路18号)     邮编:300222     邮箱:fdine@fdine.com.cn

联系电话:022-28160808     传真:022-28341925     

备案编号:津ICP备11004384号-1      津公网安备 12010302002235号          技术支持:天津卡姆科技

荣休之家

港工技术