Yiyuan Dock Base Phase-1 Project of Dalian

更新时间:2018-04-24 14:26:08点击次数:1632次
Yiyuan dock base of Dalian is composed of a dry dock, ship repair berths, an integrated workshop and other facilities. The dry dock may accommodate the ships up to 60,000 DWT, with a pneumatic flap steel gate, and a pre-fabricated caisson structure as the
相关介绍
Yiyuan dock base of Dalian is composed of a dry dock, ship repair berths, an integrated workshop and other facilities. The dry dock may accommodate the ships up to 60,000 DWT, with a pneumatic flap steel gate, and a pre-fabricated caisson structure as the dock head dolphin. Among the five ship-repair berths, the east wall of the dry dock also serves as one berth in length of 300m, the south revetment serves as another berth for the ships up to 30,000 DWT, and the rest three berths accommodate the ships up to 60,000 DWT.

Copyright © 2009 fdine.com.cn All Rights Reserved 中交第一航务工程勘察设计院有限公司 版权所有

公司地址:天津市河西区颐航大厦(洞庭路18号)     邮编:300222     邮箱:fdine@fdine.com.cn

联系电话:022-28160808     传真:022-28341925     

备案编号:津ICP备11004384号-1      津公网安备 12010302002235号          技术支持:天津卡姆科技

荣休之家

港工技术