中文|ENGLISH

在线客服 >

周一至周五 :8:00-17:00

传真:022-28341925

联系电话:022-28160808

E-mail:fdine@fdine.com.cn

下载中心 >

煤炭专用码头您当前所在位置:首页 > 咨询设计 > 工程设计 > 港口码头及配套设施 > 固体散装码头 > 煤炭专用码头 > 正文

Phase 3、Phase 4、Phase 5 Coal Terminals of Qinhuangdao Por

更新时间:2018-04-23 15:48:29点击次数:1067次
Phase 3 Coal terminal has two 35000 dwt berthw and one 100 000 DWT berth with quay length of 840 m, exporting coal at rate of 30 mpta, with ship loading capacity of 6 000t/h and wih storage capacity of 1,500 000 tons. Phase 4 Coal terminal has two 35 000
相关介绍
Phase 3 Coal terminal has two 35000 dwt berthw and one 100 000 DWT berth with quay length of 840 m, exporting coal at rate of 30 mpta, with ship loading capacity of 6 000t/h and wih storage capacity of 1,500 000 tons.
Phase 4 Coal terminal has two 35 000 dwt berths and one 100 000 dwt berth with quay length of 771 m, exporting coal at rate of 40 mpta, with ship loading capacity of 6 000t/h and wih storage capacity of 2 200 000 tons.
Phase 5 Coal terminal has four berths ranging from 50 000 dwt to 150 000 dwt with quay length of 1 187 m, exporting coal at rate of 50 mpta, wih storage yard area of 770 000 m2.

Copyright © 2009 fdine.com.cn All Rights Reserved 中交第一航务工程勘察设计院有限公司 版权所有

公司地址:天津市河西区颐航大厦(洞庭路18号)     邮编:300222     邮箱:fdine@fdine.com.cn

联系电话:022-28160808     传真:022-28341925     

备案编号:津ICP备11004384号-1      津公网安备 12010302002235号          技术支持:天津卡姆科技

荣休之家

港工技术