Phase 1 and Phase 2 Coal Terminal at Huanghua Port

更新时间:2018-04-23 15:48:56点击次数:1103次
Phase 1 Coal Terminal has four 35000 dwt berths, in total quay length of 860 m, with annual throughput capacity of 30 mtpa. Phase 2 has two 50000 dwt berths and one 100000 dwt bertb, in total quay length of 840 m, connected to an approach channel of 36.28
相关介绍
Phase 1 Coal Terminal has four 35000 dwt berths, in total quay length of 860 m, with annual throughput capacity of 30 mtpa. Phase 2 has two 50000 dwt berths and one 100000 dwt bertb, in total quay length of 840 m, connected to an approach channel of 36.28 km, with throughput capacity of 60-65 mtpa.

Copyright © 2009 fdine.com.cn All Rights Reserved 中交第一航务工程勘察设计院有限公司 版权所有

公司地址:天津市河西区颐航大厦(洞庭路18号)     邮编:300222     邮箱:fdine@fdine.com.cn

联系电话:022-28160808     传真:022-28341925     

备案编号:津ICP备11004384号-1      津公网安备 12010302002235号          技术支持:天津卡姆科技

荣休之家

港工技术