Monday to Friday :8:00-17:00
Fax:022-28341925
Tel:022-28160808
E-mail:fdine@fdine.com.cn
Phase 1 Coal Terminal has two 5 0000 dwt berths with quay length of 615m, exporting coal at rate of 20 mpta, wih ship loading capcity of 6 000t/h, storage capacity of 1 million tons.
Phase 2 Coal Terminal has one 50 000 dwt berth and one 20 000 dwt berth with quay length of 548 m, exporting coal at rate of 10 mpta, wih storage capacity of 500 000 tons. The wharf is of open caisson structure that has been first used in China.
Copyright © 2009 fdine.com.cn All Rights Reserved CCCC FIRST HARBOR CONSULTANTS CO., LTD. Copyright
Address: Fdine Tower, 18 Dongting Road, Hexi District, Tianjin, China P.C:300222 Email:fdine@fdine.com.cn
Tel:022-28160808 FAX:022-28341925
ICP Record:津ICP备11004384号-1 津公网安备 12010302002235号 Powered by:comkeji
Rong Xiu Home
GangGong TEC