中文|ENGLISH

Service >

Monday to Friday :8:00-17:00

Fax:022-28341925

Tel:022-28160808

E-mail:fdine@fdine.com.cn

Download Center >

Coal dedicated terminalsAddress:Home > Consultation > Consulting design > Ports, terminals > Solid Bulk Cargo Terminals > Coal dedicated terminals > Article

Phase 1 and Phase 2 Coal Terminal of Qinhuangdao Port

更新时间:2018-04-23 15:47:19点击次数:939次
Phase 1 Coal Terminal has two 5 0000 dwt berths with quay length of 615m, exporting coal at rate of 20 mpta, wih ship loading capcity of 6 000t/h, storage capacity of 1 million tons. Phase 2 Coal Terminal has one 50 000 dwt berth and one 20 000 dwt berth
相关介绍

Phase 1 Coal Terminal has two 5 0000 dwt berths with quay length of 615m, exporting coal at rate of 20 mpta, wih ship loading capcity of 6 000t/h, storage capacity of 1 million tons.

Phase 2 Coal Terminal has one 50 000 dwt berth and one 20 000 dwt berth with quay length of 548 m, exporting coal at rate of 10 mpta, wih storage capacity of 500 000 tons. The wharf is of open caisson structure that has been first used in China.




Copyright © 2009 fdine.com.cn All Rights Reserved CCCC FIRST HARBOR CONSULTANTS CO., LTD. Copyright

Address: Fdine Tower, 18 Dongting Road, Hexi District, Tianjin, China     P.C:300222      Email:fdine@fdine.com.cn

Tel:022-28160808     FAX:022-28341925     

ICP Record:津ICP备11004384号-1      津公网安备 12010302002235号         Powered by:comkeji

Rong Xiu Home

GangGong TEC

津公网安备 12010302002235号