Construction SupervisionAddress:Home > Engineering > Work Records > Construction Supervision > Article
Phases 1 and 2 Projects for Upgrading of the deep water channel at the estuary o
更新时间:2019-01-08 13:17:15点击次数:1107次
Phase 1 Project: North Breakwater in length of 10090m and groins in total length of 2450m, both constructed with semi-circular reinforced concrete structure.
Phase 2 Project: North Breakwater Extension Sections N46+600 to N49+200 in total length of 2600m
相关介绍
Phase 1 Project: North Breakwater in length of 10090m and groins in total length of 2450m, both constructed with semi-circular reinforced concrete structure.
Phase 2 Project: North Breakwater Extension Sections N46+600 to N49+200 in total length of 2600m, armored with hexagon hollow blocks.