Phases 1 and 2 Projects for Upgrading of the deep water channel at the estuary o

更新时间:2019-01-08 13:17:15点击次数:1107次
Phase 1 Project: North Breakwater in length of 10090m and groins in total length of 2450m, both constructed with semi-circular reinforced concrete structure. Phase 2 Project: North Breakwater Extension Sections N46+600 to N49+200 in total length of 2600m
相关介绍
Phase 1 Project: North Breakwater in length of 10090m and groins in total length of 2450m, both constructed with semi-circular reinforced concrete structure.
Phase 2 Project: North Breakwater Extension Sections N46+600 to N49+200 in total length of 2600m, armored with hexagon hollow blocks.


Copyright © 2009 fdine.com.cn All Rights Reserved CCCC FIRST HARBOR CONSULTANTS CO., LTD. Copyright

Address: Fdine Tower, 18 Dongting Road, Hexi District, Tianjin, China     P.C:300222      Email:fdine@fdine.com.cn

Tel:022-28160808     FAX:022-28341925     

ICP Record:津ICP备11004384号-1      津公网安备 12010302002235号         Powered by:comkeji

Rong Xiu Home

GangGong TEC

津公网安备 12010302002235号