中文|ENGLISH

Service >

Monday to Friday :8:00-17:00

Fax:022-28341925

Tel:022-28160808

E-mail:fdine@fdine.com.cn

Download Center >

Construction SupervisionAddress:Home > Engineering > Work Records > Construction Supervision > Article

Phase 1 Ore Terminal at Caofeidian Harbor

更新时间:2019-01-08 13:22:11点击次数:615次
Two berths for ore ships up to 250,000 dwt tons, of structure on steel pipe piles in diameter of 1.2m, with total berth line length of 792m and a trestle in length of 194m and width of 16m supported on steel pipe pile buttress.
相关介绍
Two berths for ore ships up to 250,000 dwt tons, of structure on steel pipe piles in diameter of 1.2m, with total berth line length of 792m and a trestle in length of 194m and width of 16m supported on steel pipe pile buttress.


Copyright © 2009 fdine.com.cn All Rights Reserved CCCC FIRST HARBOR CONSULTANTS CO., LTD. Copyright

Address: Fdine Tower, 18 Dongting Road, Hexi District, Tianjin, China     P.C:300222      Email:fdine@fdine.com.cn

Tel:022-28160808     FAX:022-28341925     

ICP Record:津ICP备11004384号-1      津公网安备 12010302002235号         Powered by:comkeji

Rong Xiu Home

GangGong TEC

津公网安备 12010302002235号